Trade31
Trade31
What is DPU? Delivered at Place Unloaded — Seller Must Unload — practical guide.
Incoterms · Reading time: 16 min read
DPU (Delivered at Place Unloaded) is the only Incoterm® that requires the seller to unload at the named place. Import clearance still sits with the buyer — plan terminal capability before you promise DPU. • Key…
Essentials
Quick answer, takeaways, and checklist — core value in 1–2 minutes.
DPU (Delivered at Place Unloaded) is the only Incoterm® that requires the seller to unload at the named place. Import clearance still sits with the buyer — plan terminal capability before you promise DPU.
What is DPU? Delivered at Place Unloaded — Seller Must Unload is a core topic in international trade practice. DPU (Delivered at Place Unloaded) is the only Incoterm® that requires the seller to unload at the named place. Import clearance still sits with the buyer — plan terminal capability before you promise DPU.
Practical detail
Process, risks, examples, and mistakes — expand when you need them.
ExpandTrade31 Knowledge / Tools · Trade31 Intelligence · Trade31 Products · Trade31 Workflows (future)
Wrong DPU choices change landed cost, cash timing, or document acceptance. Rebuild the commercial model after any change.
Main risks: cash lock, document rejection, duty surprise, shipment delay, and relationship damage from unclear terms.
Situation: You must decide how to handle DPU now.
What is the safest next step?
DPU replaces DAT from earlier rules. The seller delivers when goods are unloaded at the named place of destination. If the seller cannot safely unload, do not use DPU — use DAP instead.
Keep definitions operational: name places/ports, dates, document triggers, and cash milestones — avoid naked acronyms in contracts.
Use the decision tree above, lock the chosen path in writing (RFQ / PI / contract), then verify with related Trade31 tools before deposit.
What is DPU? Delivered at Place Unloaded — Seller Must Unload affects quote accuracy, document compliance, clearance speed, and payment security. Build these dimensions into your SOP.
| Area | Effect | Recommended action |
|---|---|---|
| Compliance | Wrong fields or terms trigger holds, amendments, or penalties | Pre-shipment review against latest rules and bank/buyer requirements |
| Cost | Hidden charges or unclear responsibility erodes margin | Model full cost with calculators before confirming quotes |
| Lead time | Inconsistent documents delay clearance and release | Cross-check invoice–PL–B/L with a checklist |
| Risk | Disputes over transfer points drive claims | Contract the place, Incoterms version, and evidence rules |
Apply this guide to What is DPU? Delivered at Place Unloaded — Seller Must Unload in these situations:
DPU matters for project cargo and terminal handovers where unloading equipment is seller-controlled. Misusing it for a buyer warehouse without unload rights creates cost fights.
Use this guide when your deal depends on clear responsibility, cash timing, document control, or compliance classification. Prefer it for first shipments, new buyers/suppliers, and high-value POs.
Do not treat this page as legal advice, country-specific tariff law, or a substitute for bank/counsel/broker instructions on regulated goods.
Type: Buyer email
Subject: DPU confirmation
Please confirm DPU terms in writing on the PI before deposit.
Type: RFQ
RFQ must state DPU assumptions with Incoterms, MOQ, lead time, and payment so quotes compare.
Deep reference
Long explanations, FAQ, and supporting material — collapsed by default.
ExpandPair this guide with quotation, landed cost, Incoterms, and document tools. Continue to related Trade Knowledge articles for MOQ, lead time, OEM/ODM, RFQ writing, and supplier verification.
Continue on Trade31: Country Guides · Supplier Directory · Product Directory · RFQ workflow · Buyer Workspace · AI Workspace · Trade Tools.
Importer: Apply DPU on a live PO
Exporter: Explain DPU to buyer
SME: First use of DPU
Carry this Decision Cluster into reusable execution modes: Decide · Checklist · Documents · Workspace.